Client
State Water (NSW)
Project Value
$4.8 Million
Project Commenced
January 2014
Project Completed
September 2014
Referee
Mr. Guresh Ahuja
State Water
Ph 1300 662 077
Burrendong Dam Auxillary Spillway
The construction of the Auxilary Spillway at Burrendong Dam was to provide additional spillway capacity for extreme flood events. The construction of the Burrendong Dam auxiliary spillway involves significant earthworks, with the excavation of thousands of cubic meters of rock required. The design and constructions of access tracks required to withstand the load of heavy construction plant was imperative to the success of this project.
Key features include:
Complex concrete and structural steel
Elevated overpass structure with complex geometry
Structures carrying public utilities
Design Management
Complex Stakeholders/Community interfaces and project management aspects